It will be ready to walk on in 8 hours, and we've got an 8 day break before we move the furniture back. So... ideas for things to do on a big, empty, shiny new floor. Don't say bowling!
Friday, 9 August 2013
The floor project, Day 5.
Posted on 09:40 by Unknown
It's all over but the drying.

It will be ready to walk on in 8 hours, and we've got an 8 day break before we move the furniture back. So... ideas for things to do on a big, empty, shiny new floor. Don't say bowling!
It will be ready to walk on in 8 hours, and we've got an 8 day break before we move the furniture back. So... ideas for things to do on a big, empty, shiny new floor. Don't say bowling!
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment